OGWRP County Bridge Replacement Planning Project (Conceptual Design and Cost Estimate)
Project Description:
The East Low Canal in Adams and Grant Counties has been widened under the Odessa Groundwater Replacement Program (OGWRP) as implemented by the East Columbia Basin Irrigation District (ECBID), U.S. Bureau of Reclamation (USBR), Washington State Department of Ecology and Office of Columbia River (Ecology). The irrigation canal widening will provide surface water from the Federal Columbia Basin Project to replace existing deep-well irrigation of agriculture land that causes declining groundwater in the Odessa Subarea.
Ten (10) bridges (8 in southwest Adams County and 2 in southeast Grant County) are affected by the widening of the canal and need to be lengthened to allow for the increase of canal hydraulic capacity. The purpose of this planning project was to develop prototype bridge designs along with cost estimates to determine the amount of design and construction funding needed.
Related Documents:
Final Planning Report
Geotech Report
STIP Six-year Transportation Improvement Program 2021-2026
Description: The STIP includes projects such as pavement overlays, roadway widening, bridge replacement or repair, signal systems, safety enhancements, and transit improvements that Adams County anticipates undertaking in the corresponding six-year period.
Projects included in the STIP are funded by a combination of federal, state and local sources. Federal-aid projects must be included in the STIP before Federal Highway Administration or Federal Transit Administration can authorize the expenditure of federal funds. The adopted STIP, therefore, is used for developing the annual construction program budget each year. A project may be canceled at any time during the course of study or design.
Related Documents:
2021-2026 STIP Map (2.1MB)
2021-2026 STIP Project Worksheet (41.7KB)
R-057-2020 (29KB)
CRP 193 Booker Rd MP 4.04-4.54, 1300' either side of SR26 Intersection
Description: This project will replace the existing road surfacing from 1300' north and south of SR26 on Booker Road and install advance rumble bars on Booker Road prior to the intersection with SR26 as a first step in much needed safety improvements at the intersection.
Status: Complete
Related Documents:
Location Map
Bid Tab
CRP 185 Lind-Hatton #5, MP 12.37-13.30
Description: This project will mitigate roadside hazards by modifying side slopes; widening shoulders; adding guardrail; and replace or protect drainage facilities as needed.
Status: Complete
Related Documents:Location MapBid Tab
ERP 801 2021 County-wide Crushing
Description: County-wide crushing and inspection of rock for maintenance use.
Status: Complete
Related Documents:
Bid Tab (39KB)
CRP 194 Booker Overlay #1, MP 4.54-6.50
Description: This project includes pavement repair, HMA wearing surface, and other improvements as necessary.
Status: Complete
Related Documents:
Bid Tab
Location Map
STIP Six-year Transportation Improvement Program 2022-2027
Description: The STIP includes projects such as pavement overlays, roadway widening, bridge replacement or repair, signal systems, safety enhancements, and transit improvements that Adams County anticipates undertaking in the corresponding six-year period.
Projects included in the STIP are funded by a combination of federal, state and local sources. Federal-aid projects must be included in the STIP before Federal Highway Administration or Federal Transit Administration can authorize the expenditure of federal funds. The adopted STIP, therefore, is used for developing the annual construction program budget each year. A project may be canceled at any time during the course of study or design.
Related Documents:
2022-2027 STIP Map (2.5MB)
2022-2027 STIP Project Worksheet (50.5KB)
R-55-2021 (300KB)
CRP 195 Booker Overlay #2, MP 8.03-12.01 (Foley Rd to Providence Rd)
Description: This project includes pavement repair, HMA wearing surface, and other improvements as necessary.
Status: Complete
Related Documents:
Location Map
Bid Tab
CRP 186 Cunningham Rd Widening #2, MP 8.39-11.04 (Lauer Rd to US395)
Description: This project will mitigate roadside hazards by modifying side slopes; widening shoulders; adding guardrail; and replace or protect drainage facilities as needed.
Status: Road Closed through October
Related Documents:
Location Map
Bid Tab
CRP 192 McKinney Rd #1, MP 0.00-2.01 (Hatton Rd to Bench Rd)
Description: Work will consist of reconstructing the roadway; widening shoulders; adding guardrail; and HMA surfacing.
Status: TBD
Related Documents:
Location Map