Hampton & Yeisley Paving Project
Description: Rehabilitation of roadway by asphalt surfacing overlay and other work. Hampton is a Maintenance Project while Yeisley is work that utilizes FEMA funding.
Status: Complete
Related Documents:
Bid Tab (19KB)Location Map
CRP 187 McKinney/Thacker Road Safety Project, Bench RD to 500' S SR26
Description: Reconstruction of the roadway by grading; shoulder widening; culvert replacement; resurfacing the road with crushed surfacing and an asphalt wearing surface; and other work.
Status: Complete
Related Documents:Location Map Notice to Contractors (412KB)Bid Tab (26.4KB)
CRP 189 Deal Road Widening/Surfacing & Deal Road Project #1
Description: This project addresses two sections of Deal Road;
*Deal Road Project #1 is between Leisle Road (M.P. 5.84) and Urquhart Road (M.P. 8.23)
*Deal Road Widening/Surfacing is between WB I-90 (M.P. 8.90) and Rosenoff Road (M.P. 11.87)
The work consists of reconstruction of the roadway by grading; shoulder widening; culvert replacement; and resurfacing the road with crushed surfacing and other work.
Status: Complete
Related Documents:
Location Map
Notice to Contractors (42 KB)
Bid Tab (78KB)
Bid Tab for Phase 2
SR24 Intersection Improvement @ Bench Rd
Description: This project provides for the improvement of SR24, M.P. 78.22 to M.P. 78.68, near the City of Othello, in Adams County, by removing structures; roadway excavation; embankment compaction; drainage; storm sewer; cement concrete paving; hot mix asphalt; erosion control; cement concrete curbing; ADA curb ramps; traffic control; illumination system; pavement markings; and other work.
Status: Complete
Related Documents:
WSDOT Project Page
CRP 190 Atkinson Road
Description: Work will consist of grading, draining, widening of roadway, and asphalt surfacing to re-establish crown and add superelevation on curves.
Status: Complete
Related Documents:
Location
Notice to Consultants
Bid Tab
OGWRP County Bridge Replacement Planning Project (Conceptual Design and Cost Estimate)
Project Description:
The East Low Canal in Adams and Grant Counties has been widened under the Odessa Groundwater Replacement Program (OGWRP) as implemented by the East Columbia Basin Irrigation District (ECBID), U.S. Bureau of Reclamation (USBR), Washington State Department of Ecology and Office of Columbia River (Ecology). The irrigation canal widening will provide surface water from the Federal Columbia Basin Project to replace existing deep-well irrigation of agriculture land that causes declining groundwater in the Odessa Subarea.
Ten (10) bridges (8 in southwest Adams County and 2 in southeast Grant County) are affected by the widening of the canal and need to be lengthened to allow for the increase of canal hydraulic capacity. The purpose of this planning project was to develop prototype bridge designs along with cost estimates to determine the amount of design and construction funding needed.
Related Documents:
Final Planning Report
Geotech Report
STIP Six-year Transportation Improvement Program 2021-2026
Description: The STIP includes projects such as pavement overlays, roadway widening, bridge replacement or repair, signal systems, safety enhancements, and transit improvements that Adams County anticipates undertaking in the corresponding six-year period.
Projects included in the STIP are funded by a combination of federal, state and local sources. Federal-aid projects must be included in the STIP before Federal Highway Administration or Federal Transit Administration can authorize the expenditure of federal funds. The adopted STIP, therefore, is used for developing the annual construction program budget each year. A project may be canceled at any time during the course of study or design.
Related Documents:
2021-2026 STIP Map (2.1MB)
2021-2026 STIP Project Worksheet (41.7KB)
R-057-2020 (29KB)
CRP 193 Booker Rd MP 4.40-4.54, 1300' either side of SR26 Intersection
Description: This project will replace the existing road surfacing from 1300' north and south of SR26 on Booker Road and install advance rumble bars on Booker Road prior to the intersection with SR26 as a first step in much needed safety improvements at the intersection.
Status: Funded
Related Documents:
Location Map
CRP 185 Lind-Hatton #5, MP 12.37-13.30
Description: This project will mitigate roadside hazards by modifying side slopes; widening shoulders; adding guardrail; and replace or protect drainage facilities as needed.
Status: Funded
Related Documents:
Location Map
ERP 801 2021 County-wide Crushing
Description: County-wide crushing and inspection of rock for maintenance use.
Status: Starting in Spring 2021
Related Documents:
Bid Tab (39KB)
CRP 194 Booker Overlay #1, MP 4.54-6.50
Description: This project includes pavement repair, HMA wearing surface, and other improvements as necessary.
Status: Fall
Related Documents:
Location Map